VERTECHS ROI-model
|
|
|
|
|
|
|
|
Please fill in our own figures in the bleu spots and recalculate
|
|
|
|
Amount of containers you load per month
|
|
|
|
|
|
|
|
Minimum load per container with the VERTECHS system *
|
ton
|
28
|
|
Minimum total load per month with the VERTECHS system *
|
ton
|
2800
|
|
Current load in your containers
|
ton
|
|
|
Current total load per month in your containers
|
ton
|
2700
|
|
Montly loss on weight because of not reaching maximum load
|
ton
|
100
|
|
Extra required containers because of not reaching maximum load
|
ctrs
|
3.571
|
|
|
|
|
|
Your cost per container for export
|
euro
|
€ |
|
|
|
|
|
1st savings per month based on reaching maximum load
|
euro
|
|
|
|
|
|
|
Cost per container for a tilting container trailer (if available)
|
euro
|
€
|
|
Cost per container for a regular container trailer
|
euro
|
€
|
|
Savings on using regular trailers instead of tilting trailers per ctr.
|
euro
|
€ 150
|
|
This is even without a possible lower charge because of shorter waiting times
|
|
|
|
2nd savings per month because of using regular container trailers
|
euro
|
|
|
|
|
|
|
TOTAL SAVINGS PER MONTH BECAUSE OF USE VERTECHS
|
euro
|
|
|
|
|
|
|
Return On Investment of VERTECHS system (in months)
|
maand
|
|
|
|
|
|
|
Long term savings because of use VERTECHS
|
|
|
|
Long term savings after Year 1
|
|
|
|
Long term savings after Year 2
|
|
|
|
Long term savings after Year 3
|
|
|
|
* Min. belading per container afhankelijk van materiaalsoort
|
|